Zak Dirt, Inc. will install riprap under or around five different bridge sites to repair damage done by the 2013 flooding. The project will also include wetland mitigation, bank stabilization, sheet piling, and miscellaneous structure work.

This project was temporarily placed on hold pending redesign, but is now back under construction.